Cabling outlives every computer, switch and phone system plugged into it. Done well, it carries your network for a decade or more; done badly, it becomes a tangle nobody can trace. We plan, install, test and document cabling for offices, warehouses and moves.

Reviewed by the ITRS security team · Last updated

01

Planning drops and runs

We start from how the space will be used, not just where the desks are today. Each workstation, printer, phone, wireless access point, camera, door controller and display gets a planned drop, plus spares for growth. Running a few extra cables during construction costs far less than opening ceilings later.

We plan cable paths, distances back to the communications room, and pathways through walls and ceilings, and coordinate with your landlord, general contractor and electrician. Ethernet copper runs are limited to 100 metres per channel, so large floors may need more than one telecom closet.

  • Workstation drops, typically two per desk.
  • Ceiling drops for wireless access points and cameras, powered over Ethernet.
  • Drops for printers, TVs and boardroom equipment.
  • Backbone links between floors or closets, often fibre.
  • Spare capacity for future growth.
02

Cable categories

For new installations we generally recommend Category 6A for access point drops, because modern Wi-Fi and higher-power Power over Ethernet benefit from it, and Category 6 or 6A for desks depending on budget and plans. Plenum-rated cable is used where building codes or the landlord require it in air-handling spaces.

TypeTypical useNotes
Category 6
General office drops
Gigabit to every desk; 10-gigabit only over shorter runs
Category 6A
New builds, wireless access points, future-proofing
Rated for 10-gigabit over the full 100-metre channel; thicker cable, larger pathways
Fibre (multimode or single-mode)
Backbone between closets and floors, longer distances
Immune to electrical interference; needs suitable switch modules
03

Racks and patching

The communications room is where cabling either stays tidy for years or turns into a mess. We install racks or wall cabinets with patch panels, cable management, and space for switches, firewalls, UPS units and, where you have them, servers or recorders.

Patch cords are sized to length and colour-coded by function (for example, one colour for wireless, another for cameras). Power is planned for the equipment the rack will hold, and the room should be lockable: the Canadian Centre for Cyber Security's baseline controls for small and medium organizations treat physical access to network equipment as part of protecting it.

04

Testing and test reports

Every run is tested end to end after termination. A cable certification tester checks wiremap, length, insertion loss, crosstalk and other parameters against the category's performance standard, and produces a report for each link. Those reports are handed over with the job, so you have proof the cabling performs as specified and a baseline if a problem appears later.

Fibre links are tested for loss and polarity. Any failing link is re-terminated or replaced before sign-off.

05

Documentation and labelling

Good documentation is what makes the next move, addition or troubleshooting call quick. It also helps security: you can tell what an unexpected device plugged into port 2-14 is, and where it is.

  • Every jack and patch panel port labelled with a matching, consistent identifier.
  • Floor plans showing each drop's label and location.
  • Port map showing which switch port serves which jack and its VLAN.
  • Test reports organized by label.
  • Photos of the communications room and ceiling pathways at completion.
06

Moves and additions

Offices change. We handle additional drops, reconfigurations after renovations, and full office moves, coordinating cabling with your internet provider's installation, phone system, wireless and security systems so everything works on the first morning in the new space.

For moves, we survey the new space early, ideally before lease details are finalized, so cabling and communications room needs are in the plan rather than a surprise. Our teams work across the GTA from Vaughan and Toronto, and in the Vancouver area.

  1. Survey

    Walk the space and review drawings.

  2. Design and quote

    Drop schedule, cable types, rack layout and pathway plan.

  3. Install

    Run, terminate, dress and label.

  4. Test and document

    Per-link reports, floor plans and port maps handed over.

  5. Connect

    Patch to switches, configure VLANs, verify devices.

07

Questions we hear

Wireless access points themselves need cabling, and desktops, printers, phones and cameras are more reliable wired. Most offices need both.

Case studies
Keep reading

Related.

  • PracticeManaged IT SupportHelpdesk and break/fix, networking, security systems, devices, Microsoft 365, cloud and backup.
  • ServiceBusiness Wi-Fi design and installationOffice Wi-Fi that drops video calls, a warehouse where scanners lose signal in the back aisles, a guest network that sits on the same network as your file server: these…
  • ArticleOffice Move IT Checklist for GTA BusinessesAn office move IT checklist for GTA businesses: when to order the internet circuit, network drops, phones, backups, and the order to cut over on move weekend.
  • ServiceNetwork Support and Network Management in TorontoIT Rapid Support provides network support and network management for Toronto and GTA businesses: firewalls, switches, Wi-Fi, VPN and remote access, links between sites…
  • ServiceSecurity cameras and access controlIP cameras and electronic door access protect your premises, but every camera and controller is also a small computer on your network.
Next step

Want this handled for your business?

Tell us your users, devices and sites. We are staffed 24/7 and reply with next steps. Quotes are built from your environment, not a price list. Active incident? Call (289) 582-9930, 24/7.